Our Projects

PROJECTS

Each started with problems other workshops could not solve - Each one ended with an asset back in service, on schedule to specification

Projects

A catalogue of projects for all kinds of problems

Click any project for the full case study.

GRIMALDI GROUP . RO-RO

Grande Costa d'Avorio

Reconstruction

Full post-fire reconstruction delivered to client

Duration

138 Days

MSC . CONTAINER SHIP

MSC Maria Saveria

Afloat Repair

Rudder system repaired without drydocking the vessel.

Duration

6 Days

MSC . CONTAINER SHIP

MSC Candice

In-site Machining

Main engine crankpin restored without removing the engine.

Duration

60 Days

Have a project that looks impossible?

The projects on this page began the same way. Tell us what you're facing and we'll

tell you what's possible.

2026 Jobson Italia S.r.l. All rights reserved.

2026 Jobson Italia S.r.l. All rights reserved.

2026 Jobson Italia S.r.l. All rights reserved.