Our Projects
PROJECTS
Each started with problems other workshops could not solve - Each one ended with an asset back in service, on schedule to specification

Projects
A catalogue of projects for all kinds of problems
Click any project for the full case study.

GRIMALDI GROUP . RO-RO
Grande Costa d'Avorio
Reconstruction
Full post-fire reconstruction delivered to client
Duration
138 Days

MSC . CONTAINER SHIP
MSC Maria Saveria
Afloat Repair
Rudder system repaired without drydocking the vessel.
Duration
6 Days

MSC . CONTAINER SHIP
MSC Candice
In-site Machining
Main engine crankpin restored without removing the engine.
Duration
60 Days
Have a project that looks impossible?
The projects on this page began the same way. Tell us what you're facing and we'll
tell you what's possible.
